You are pricing a crew’s work. Move between time, output and cost without mixing person-hours with the hours of the whole crew.
Installation workfaceThis workface needs one excavator, its operator, two pipe layers and a banksman. Bring those resources onto the job.
A crew’s paid time produces a length of accepted work. Plant and people work together to create that output.

Select a marker to connect the physical work to the estimate.
Tomas Castelazo · CC BY-SA 3.0 · resized; numbered markers added.
Source: https://commons.wikimedia.org/wiki/File:114_inch_pipe_installation.jpg
Licence: https://creativecommons.org/licenses/by-sa/3.0/

Illustrative scene. Use the lesson figures and records for measurements.
Bring the required resources into this work package.
Drag a resource into the work package, or select its + button. Select − to remove it.