Installation is complete only in a physical sense. You are identifying the tests, approvals and connections needed before the main can enter service.
Water-main commissioningThe main is installed. Open the integrity-test, water-quality and connection-authorisation records. They are not yet complete.
Physical installation is followed by testing, acceptance and a controlled connection to the operating system.

Select a marker to connect the physical work to the estimate.