Confirm the baseline

35 min · 1 of 6 scenesProgress kept on this device
Workplace design review with material samples, collaboration seating and a glazed meeting room
MERIDIAN HOUSE · FICTIONAL PROJECTControl design changeCost Plan 02 is £18.92m. The change must be compared with the same P03 design and room-data assumptions.
01Cost Plan 02, revision 0202Room data RDS-P0303Value log VE-02
Project record in view
Change registerCR-004 compares the request with Cost Plan 02 and room data P03.

Key evidence

Evidence to inspect
Project basis

Meridian House · 7,800 m²

Generated project illustration. Use the lesson records for quantities and decisions.
Your task

Fix the cost, design and option baseline before valuing the request.

Inspect one evidence item to continue.

Project records Cost plan · Changes · Risk · Programme
Cost plan£18.50m affordability limit established
Change registerCR-000 · baseline assumptions recorded
Risk allowances£1.35m initial project allowance
ProgrammeOccupation target · 31 March 2028