Work through the questions behind the estimate
Start with a question, then explore the drawing, calculation or project decision in a practical lesson.
Explore the learning library
Choose a question to work through
What belongs in a construction takeoff?
Start with the drawing scope and revision, then separate the measured work into items with clear units. Include fittings and crossings where the records require them.
Follow the main · 12 minHow do I measure trench excavation?
Establish the trench length, width and depth from the available information. Check how changes to the section affect excavation, support and the installed work.
Shape the trench · 15 minHow does crew productivity affect a unit rate?
The crew consumes paid time while producing a measurable output. Relating those resources to the finished quantity gives a consistent basis for the unit rate.
Build the crew rate · 12 minWhat is included in an installed material cost?
A supplier price covers a stated supply scope. Compare that scope with the finished installation, including the labour, plant and other work needed to put it in place.
What will the material really cost? · 12 minHow do I check which activity controls completion?
Follow the dependencies through the programme and compare the resulting paths. Test a change against the full sequence rather than looking at an activity in isolation.
Which path controls handover? · 10 minHow do I review a construction estimate?
Trace quantities, rates and allowances back to the scope and supporting records. Check omissions, overlaps and assumptions before relying on the total.
Reconcile the Ashbridge estimate · 18 min