RATE BUILD-UPS PRACTICE LAB
How much should you order?
Separate net quantities from purchasing allowances.
On site
From delivered material to installed work

Illustrative scene. Use the lesson figures and records for measurements.
THE SCENARIO · GBP
You need 450 m³ installed concrete at 91.50 per purchased m³. Apply a 3% purchasing addition to the net quantity. Ignore all non-material costs.
Build your answer
Enter your results to two decimal places. Use full precision between calculation steps.
Members can save a draft and resume later.
Saving is available to site members. You can use the tools and export your calculations without saving an account record