Edit quantities and resource costs in a working estimate, then save or export the result
Project basis and exclusions
A fictional wastewater pumping station upgrade with a 500 m PE rising main. Quantities and GBP rates are illustrative.
Land, design fees, utility diversions, dewatering, temporary works, preliminaries, overhead, profit, contingency and tax are excluded. Add them where the project requires them.
Top-level NRM2 and CESMM groups are editable review aids. Confirm measurement rules against the specification.