The elevation of the finished cover surface, measured from the project datum.
On the drawing
Node schedules, drainage plans and chamber details.
Estimating connection
It gives the top of the depth calculation.
Common mistake
Confusing an elevation with a depth below ground.
Drawing and technical references
All project drawings are original Scope Economics training schematics. The fictional levels and dimensions are not taken from a live contract.
Wavin UK · inspection chamber product and installation manual https://mediahub.wavin.com/m/4bd0c113e87c1b82/original/Wavin-OsmaDrain-Inspection-Chambers-Product-and-installation-manual.pdf
Uisce Éireann · wastewater standard details (construction reference, not this fictional stormwater design) https://www.water.ie/sites/default/files/docs/connections/faqs/Wastewater-Standard-Details.pdf