Riverside Stormwater Upgrade
The council is upgrading drainage along Harbour Road. Work through the MH03–MH06 teaching section, carrying your route, quantities, production and rates into one estimate.
- Client
- Riverside Council (fictional)
- Asset
- Stormwater drainage
- Setting
- Existing urban road
- Full network
- Approximately 1.8 km
- Teaching section
- MH03–MH06 · issued plan length 124.5 m
- Programme
- 20 weeks
- Stage
- Tender
The estimate covers this teaching section, not the full 1.8 km network. All dimensions, productivity and prices are training assumptions.
Start RiversideTrace the proposed main
The project journey
- 01Open lesson
Trace the proposed main
Measure the route that the rest of the estimate will use.
- 02Open lesson
Follow the pipe
Establish the fall and gradient between MH03 and MH04.
- 03Open lesson
Read the chambers
Use cover and invert levels to establish chamber depths.
- 04Open lesson
Shape the trench
Carry the route length into excavation, bedding and backfill.
- 05Open lesson
Balance an excavation fleet
Use the excavation quantity to establish production and duration.
- 06Open lesson
Build a direct unit rate
Connect measured work, resources and cost.
- 07Open estimate
Review the Riverside estimate
Review the accumulated quantities, work and cost detail.
Opening saved workspace