
Follow the main
Lesson details
One drawing. A route, fittings and a crossing. What belongs in your takeoff?
Measure quantities, build resource rates and check what the price includes.


One drawing. A route, fittings and a crossing. What belongs in your takeoff?

Drag the section and follow the effect on volumes, support and cost.
Inspect the crossing, test an excavation range and support a commercial recommendation.

One crew. One paid shift. What does each finished metre cost?

The excavator is waiting. Which resource is holding the crew back?

The supplier prices a length. You need a finished metre.

A crew, a machine and a pipe. What does one finished metre cost?

Read the depth bands, build the main rate and price a deeper, wet excavation.

Trace the quantities, scope and crew rate back to the project records.

Rebase comparable projects, locate the residual cost difference and issue the review record.